Click on "+" to expand survey materials
Scantech International to undertake a cloud burst survey which is to be repeated at 3-month intervals for 18 months i.e. 7 cloud burst surveys required. Each survey is to be overlaid on all preceding surveys, represented by different colours for each survey, to inform any distortion of the lining. Survey sections to be presented in AutoCAD and PDF format. Delivery of the surveys to the RAM Structures Team to occur throughout the 18 months as this is a monitoring exercise. Present all sections within a single AutoCAD drawing file. Cross sections to be taken 500mm c/c in AutoCAD and PDF format between SM2 to SM5+10m. Examiner or Asset Engineer from NW Tunnel Team to attend site during the initial survey to determine whether the lining is over-stressed, and cracks or crushing are evident.
Scanned by David McCrory and Josh Brazil using an RTC360.
Control was also established using a Leica T16 Totalstation.
Scantech International to undertake a cloud burst survey which is to be repeated at 3-month intervals for 18 months i.e. 7 cloud burst surveys required. Each survey is to be overlaid on all preceding surveys, represented by different colours for each survey, to inform any distortion of the lining. Survey sections to be presented in AutoCAD and PDF format. Delivery of the surveys to the RAM Structures Team to occur throughout the 18 months as this is a monitoring exercise. Present all sections within a single AutoCAD drawing file. Cross sections to be taken 500mm c/c in AutoCAD and PDF format between SM2 to SM5+10m. Examiner or Asset Engineer from NW Tunnel Team to attend site during the initial survey to determine whether the lining is over-stressed, and cracks or crushing are evident.
Scanned by David McCrory and Josh Brazil using an RTC360.
Tab 16 to 19
Tab 20+13m to tab 21
Tab 49 to 51
Tab 52 to 53
Traverse to tab 53 and install sockets at these locations
To carry out monitoring for Melling tunnel. Two new sections were added – Tab16 to Tab21 and Tab49 to Tab53. Each section scanned and 4 control points put in each section which were shot in with TS.
Tab 16 to 19
Tab 20+13m to tab 21
Tab 49 to 51
Tab 52 to 53
Monitoring job of Melling tunnel using 3d Laser scanning
P1 TO P12 1ST SECTION
P13 TO P19 2ND SECTION
P20 TO P24 3RD SECTION
Monitoring Melling Tunnel
To request additional or different data, please complete the following form and our team will be in touch.
For more information regarding the above data please contact info@scantech-international.com or call 01625 260 446
This data is accurate on the date of survey indicated. Scantech International Ltd are not liable for any changes that might occur.
To request additional or different data about a location, please complete the following form and our team will be in touch.