Click on "+" to expand survey materials
Scan Kings Cross portal and area 10m either side both track and roadside. Install control and wall targets as monitoring survey to be repeated in 5 years time.
The designer was interested in the elevations of the portals, levels above the portal and drainage.
To capture the 2 portals of Gasworks west Tunnel. We scanned 40m either side of the portal and above the portal Randell’s road side.
To carry out a pointcloud survey for the length of the tunnel at Gasworks Centre Bore. A infrared survey of the tunnel was also required to help locate wet patches in the tunnel.
Surveys were carried out be David McCrory, Jonathan McCrory and Tom Davis.
3D Model = Scantech Gen 2
To request additional or different data, please complete the following form and our team will be in touch.
For more information regarding the above data please contact info@scantech-international.com or call 01625 260 446
This data is accurate on the date of survey indicated. Scantech International Ltd are not liable for any changes that might occur.
To request additional or different data about a location, please complete the following form and our team will be in touch.